In 2024, ELTEC Green Energy delivered a high-capacity 160 MVA Main Transformer to the Serbia Electric Power Corporation (EPS), one of the largest energy providers in Southeast Europe. This project supports Serbia’s long-term goals for enhancing grid stability, increasing power transmission efficiency, and modernizing energy infrastructure to meet growing demand.
Amasan a’ Phròiseict
- Supply a high-performance power transformer for a key EPS substation.
- Improve transmission capacity and reliability in the 110 kV network.
- Support EPS’s energy infrastructure upgrade program.
Raon na h-Obrach
- Engineering & Design Support: Customized transformer solution designed to meet the client’s technical specifications and regulatory standards.
- Manufacturing & Quality Assurance: Built under strict ISO standards, with full factory testing completed before delivery.
- Logistics & Delivery: On-time delivery to the project site in Serbia, with logistics managed end-to-end by ELTEC Green Energy.
- On-site Commissioning: Technical assistance provided during installation and system integration.
Sònrachaidhean Teicnigeach
- Equipment: Claochladair Cumhachd
- Comas: 160 MVA
- Ìre Bholtaids: 110 kV
- Cooling Type: ONAN/ONAF (if applicable)
- Standards: IEC compliant, tested under full load and short-circuit conditions
Toraidhean & Buaidh
This project strengthened EPS’s transmission network by adding a robust, high-efficiency transformer to a critical node. It ensures better voltage regulation and system resilience, particularly during peak load conditions. With this upgrade, EPS is better equipped to support industrial growth and future renewable energy integration.
Carson a tha e cudromach
As national grids evolve to meet 21st-century energy needs, reliable and modern transformers are essential. ELTEC’s role in delivering this high-capacity unit to Serbia demonstrates our commitment to energy resilience, engineering excellence, and strategic partnerships across the Balkans.
Client Testimonial (Optional)
“ELTEC delivered on time and according to our technical requirements. The 160 MVA transformer is now a core part of our upgraded transmission capacity.”
– EPS Project Manager